Gemciler Diversion Weir and Hydroelectric Power Plant
The brief summary of the project:
Gemciler Regulator and HEP Generation Facility in Adıyaman province were commissioned on 19 December 2012.
Project Details
Project Type | Design – Build – Operate |
Project Location | Adıyaman, TURKEY |
Owner | Boztepe Enerji Üretim Pazarlama A.Ş. |
Project Start | 1 January 2011 |
Project End | 1 December 2012 |
Within the scope of Gemciler HEPP construction, the water needs of the lands for irrigation of the cultivated areas along the conduit route were determined and irrigation projects were prepared. Irrigation ponds were built at the key points determined according to these projects, the ponds were fed with the lines drawn from the tunnel and the irrigation was ensured to be sustainable.
Key Project Quantities:
- Yearly Production: 40.000.000 kWh