Saray Hydroelectric Power Plant
The brief summary of the project:
Saray HEPP Generation Facility in Rize province will be commissioned June 2014.
Project Details
Project Type | Design – Build – Operate |
Project Location | Trabzon, TURKEY |
Owner | Mertler Energy A.Ş. |
Project Start | 1 September 2011 |
Project End | 1 April 2014 |
Key Project Quantities:
- Yearly Production: 60.000.000 kWh
- Turbine: 3 Vertical Full Kaplan
- Net Fall: 29,7 m max., 24,8 m min.
- Flow Rate: 62 m³/s
- Water Intakes And Settling Basin (3 nos 4.00×4.20 m vertical inlet gate & 3 nos 4.00×3.60 m vertical sluiceway gate)
- Water Transmission Line (L=120 m, D=5.30 m)
- Water Tunnel (L=3743 m, D=5.30 m horse-shoe lined tunnel)
- Penstock (L=50.80 m, D=4.50 m circular section, embedded in reinforced concrete underground)
- Surge Tank (D=21 m, H=18 m circular section, steel lined reinforced concrete) (Underground)
- Power Plant (2 units, each 6.75 MW, total installed capacity is 13.50 MW, 60 GWh/year energy production)