New Air Traffic Control Tower & WAM-VHF Equipment Installation
The brief summary of the project:
The project mainly consisted of design and construction of a new Air Traffic Control Tower (ATCT) to replace the existing ATCT at Manas Internation Air Port (IAP). The tower has 8 floors plus a cab floor at the top.
Project Details
Project Type | Design – Build |
Project Location | Manas, KYRGYZSTAN |
Owner | Raytheon, Air Force |
Project Start | 06 October 2012 |
Project End | 14 September 2013 |
Additonal scope also included the following;
A Wide Area Multilateration (WAM) surveillance system which will provide nation-wide en route coverage on 26 different sites,
A WAM surveillance system to provide Terminal Maneuver Area (TMA) coverage for the ATCT at MIAP,
Adaptation of the New Information Technologies in Aviation (NITA) ALPHA Air Traffic Management (ATM) system within the Bishkek Area Control Center (BACC) to display a single integrated surveillance picture from the WAM systems and the existing Secondary Surveillance Radar data,
Very High Frequency (VHF) radios and communication equipment that will complete nation-wide radio capability for aircraft under surveillance by the BACC,
Relocation of existing ATCT systems and equipment from the existing Manas IAP tower to the new ATCT