Saray Hydroelectric Power Plant
The brief summary of the project:
INCIRLI Regulator and HEP Generation Facility in Rize province Kalkandere district was commissioned on 26 May 2011.
Project Details
| Project Type | Design – Build – Operate |
| Project Location | Rize, TURKEY |
| Owner | Laskar Enerji Üretim Pazarlama A.Ş. |
| Project Start | 1 March 2008 |
| Project End | 1 May 2011 |
